The Point

2-4 Greenwich View is located on a business park in London’s Docklands.

The proposed scheme involved demolishing 3 existing 20,000sq/ft. office buildings and convert the site into a state-of-the-art, Tier III+ data centre.  Delivering a total of 5,000m2 of “white space” @ 2.0kW / m2.

Saradan were employed by the site developer as client's design consultants and technical advisers. Saradan produced concept schemes, M&E designs, build costs and obtained full planning consent for the project. As the client's project managers Saradan oversaw the detailed design, tendering, construction and commissioning of the project that was completed mid 2017.

Key elements of the design include:-

  • Modular data hall design for phased fit out ( 8 zones)
  • Design PUE of 1.35
  • 4 x 4.0mVA 11kV power supplies (N+1)
  • 6 x 2.5mVA packaged substations (N+1)
  • 8 x 2.2mvA Diesel Generators (N+1)
  • 16 x 1.0mVA modular IGBT UPS (2N)
  • 10 x 800kW reciprocating chillers plus 12 x dry-coolers (N+1)
  • Diverse power paths and chilled water distribution pipe work systems.
  • Achieve BREEAM Excellent rating.
  • Separate administration office block fit out using waste heat from the data centre