In 2016 Saradan worked with an American contractor to help them win the “over roofing” of a “live” data centre in Crawley. The newly installed 2,500m2 flat roof recently installed as part of the build of the entire facility had many leaks which were dripping onto the tenants IT equipment. The existing roof could not be repaired as all the Diesel Generators, Transformers, UPS pods and Excool IDAC units were already in situ and operational on the roof.
Overall program was 16 months
Project value was £5m with JCT D&B contract