Overview:

Foreshore needed to transfer their data centre on a new, dedicated diesel generator backup system, the only space available was at the rear of two adjoining buildings at 1st floor level. Saradan were employed as Design & Build contractor to design and construct for the project. The work included supply and install of the generators, a steel gantry and louvered enclosure for the generators, the new electrical switchgear required to connect the generators to the existing LV switchgear + all associated electrical works, BMS interfaces, CCTV and access control etc.

Timeframe:

Saradan also had to obtain landlords approval, planning and byelaws permission for the works. The project was completed in 6 months from start to finish with no data centre downtime.

“We were looking for a Company that could help us design and build a new data centre to the highest standards, on a tight schedule. Saradan Design & Management, who came highly recommended, provided us a professional service and, just as importantly, all projects have been delivered on time and on budget.”

Technical Director
Foreshore