When Jersey Telecom decided to re-engineer, increase power and cooling capacity in their main data centre at 5 Oaks, Saradan were appointed to act as design consultants and client project managers.

A completely new M&E infrastructure had to be installed whilst keeping the existing I.T equipment “live”.

The whole project was completed on time, to budget and with zero I.T. downtime.

The new works included

  • Converting a large vehicle maintenance workshop into a new HV/LV switchgear room
  • Installation of new dual 1.5m VA mains supplies
  • N+N UPS system
  • N+1 generators
  • Replacing the close control air conditioning