In 2019, Saradan were approached by a client in the Engineering & Technology field to design & build a Data Centre to house & support a 300kW Supercomputer. As a leader in their field, our client’s investment in the Supercomputer was to support a vital part of the business’ future success and in turn a Data Centre had to be built to reflect its importance.
With our in-house capabilities, Saradan were able to consult the client on the best way to support the 300kW IT load along with how to build a Data Centre within a parking lot on a pre-existing premise. This in turn developed into the design of a 34x Rack build with 10x In-Row DX cooling units providing precision cooling and the resulting build took place over a 24 week program including the overseeing of the supercomputer install.